ANALISA FAKTOR PENYEBAB CONTRACT CHANGE ORDER DAN PENGARYHNYA TERHADAP WAKTU PELAKSANAAN PROYEK KONSTRUKSI BANGUNAN GEDUNG

DWIFRANSISCAH, REKA DWIFRANSISCAH (2023) ANALISA FAKTOR PENYEBAB CONTRACT CHANGE ORDER DAN PENGARYHNYA TERHADAP WAKTU PELAKSANAAN PROYEK KONSTRUKSI BANGUNAN GEDUNG. Project Report. Politeknik Raflesia. (Unpublished)

[thumbnail of REKA.pdf] Text
REKA.pdf

Download (3MB)

Abstract

ANALISAS FAKTOR

Item Type: Monograph (Project Report)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Program Studi Teknik Sipil
Depositing User: Unnamed user with email raflesiapoliteknik@gmail.com
Date Deposited: 30 Jan 2025 07:54
Last Modified: 30 Jan 2025 07:54
URI: http://repository.polraf.ac.id/id/eprint/34

Actions (login required)

View Item
View Item